Take me to your leader
10/01/12 08:47
Take me to your leader. The
robot is all done and on its way. we had so much fun and
got a really good result. MAY E Machine the south islands
wetter workshop.
Now its on with a very interesting machine for Alpine Fencing.

Now its on with a very interesting machine for Alpine Fencing.

Flat out for Christmas
22/12/11 20:40
We have been flat out
getting a few things ready for Christmas. Here are a
couple of things we have been working on. A trapeze rig
and a robot to mention a few. We even managed to roll the
MAY E Ator out for a spontaneous end of year drink.


MAY E Ator
28/11/11 20:30
The MAY E Ator pictured
below is a stand alone keg beer dispensing bar. It will
be available for hire from December 9th. It went through
vigorous testing last friday night at pint club hosted by
the boys at Thunderbikes. So now its just finishing of
all the little jobs and she will be up and ridding.
Go the MAY E Ator.


Go the MAY E Ator.


Buzz Buzz
30/09/11 14:35
Our 1.3 meter Buzzy Bee is
all painted up and ready to take off. have a look at the
original sized bee just beneath his head.




More robot action in the shop
26/09/11 09:10
The making of the B9 light
fitting has inspired a new creation here are some shots
of progress so far.






Buzzing in the work shop
05/09/11 20:19
Things are buzzing in the workshop with the development
of a Buzzy Bee 1.3 meters long here are some pics of
developments so far.




Holy moly look at this
22/08/11 16:22
Holy moly look at this. The
latest thing to come out of the workshop, a light fitting
named “Bad Day For B9” A play on the robot from Lost In
Space B9. Just a few more things then its install time.




Its a cut
09/08/11 09:50
Here is a small video of the cut off machine we have
just finished for Alpine Fencing. It can take timber 4
Meters long by up to 300mm square.
Nice shoes
28/07/11 20:33
Just a couple for things of
the workshop floor.
A nice new set of snow shoes for a nice new helicopter.

and the first glimpse of a new machine designed and built by MAY E Machine for Alpine Fencing’s Factory line. Its a loading conveyer and cutoff Machine. I will post a vid of it in action soon.

A nice new set of snow shoes for a nice new helicopter.

and the first glimpse of a new machine designed and built by MAY E Machine for Alpine Fencing’s Factory line. Its a loading conveyer and cutoff Machine. I will post a vid of it in action soon.

Nice
29/06/11 21:29
Half way trough the project
and I kind of like it the way it is, It’s very
photogenic.


Wal is up and riding
15/06/11 00:07
Wal is in his natural environment, His chopper. and
looking good after a some time in the hair dressers.






Lots of stuff
13/06/11 21:05
MAY E Machine has been so
flat out, I”ve been a bit slack on keeping you informed
of all the cool stuff coming out of the work shop. This
is some of it.
Hand Brakes for Race Club
Camera dolly and rail
Wheels for a helicopter transit frame.
Sheep
More work on Wal
Test for new light fitting to be named “Bad day for B9”

Hand Brakes for Race Club
Camera dolly and rail
Wheels for a helicopter transit frame.
Sheep
More work on Wal
Test for new light fitting to be named “Bad day for B9”

You can't park there
05/05/11 18:47
ZK WAL has landded on a rock
out side the Wanaka Transport & Toy Museum. No one
Can find the pilot, but that,s nothing new. MAY E Machine
has still a few things to do to finish the OZ copter, but
hope to get it fully operational soon.






Where are we
03/05/11 09:30
We have just finished a nice
pice. This is a destination bus blind from Bath going
through its tests in the workshop. MAY E Machine is
really living up to its alleged name as the south islands
little Weta workshop.


Airplane is flying
22/04/11 15:09
The airplane light fitting
has gone through it’s test and now it is flying somewhere
around Wanaka. It looks grate. It was nice to have the
opportunity to make something so cool.






Pirate video of OZcopter
13/04/11 21:08
MAY E Machine has discovered that a pirate video of a
test run of the top secret OZcopter has been leaked on
youtube. The local cyber police are following it up,
they have been questioning a 47 year old man from
Tarris who’s name has been suppressed by the court.
All going on at the machine
29/03/11 08:20
Its all going on at the
machine this week. here is a nice tool out of the machine
shop and some progress pics of the light fitting.








Airplane moving along
21/03/11 21:50
The airplane light fitting
is moving along nicely. Out of the paint shop and
lighting systems going in.


Wal get his first hands on
15/03/11 17:43
Wal get his first hands on
the new OZcopter. He said the chopper feels good but he
still needs work on his makeup and if we could stitch him
up some cloths he will feel a little less exposed.
Some nice stainless cargo racks taking shape.

Some nice stainless cargo racks taking shape.

Party on down
03/03/11 21:48
Thanks to every one who joined in on the celebrations
at the grand opening of the new workshop. and a special
thanks to Broken Shed and there exceptional Vodka,
Lara, Mikie and 47 Frocks for making the fashion show a
big success.
Drop in and check out the new place Hanger 25 mustang lane Wanaka airport (next to the skydive hanger)
Drop in and check out the new place Hanger 25 mustang lane Wanaka airport (next to the skydive hanger)
Nice piece from the new shop
03/03/11 21:42
The first nice piece from
the new shop. Counter for Skydive Lake Wanaka.




We have moved
07/02/11 20:37
We have moved to our new
workshop and ooo boy it’s a beauty. After a month of new
fit out and moving all that gear, we are up and running
again. Thanks to all our current clients for their
patience over the move. We plan to have a wee celebration
on the 25th to mark the occasion. But I must say it’s
nice to be back working on the cool stuff again. Here is
a couple of shots of the new place. Please feel free to
drop in and check us out. Hanger 25 mustang lane Wanaka
airport. ( next door to Skydive hanger )


Nice shaft
22/12/10 20:53
My wife said to me today
“nice shaft” and I must say I had to agree with her.
I love working with mixed mediums. Pizza oven door.


I love working with mixed mediums. Pizza oven door.


Shooting for the sky
10/12/10 09:10
MAY E Machine is shooting for the sky, with work on
both the airplane light fitting and OZcopter going
along well.
OZ starts the strip down
Starting on the rebuild
Fuse hoops done
All hoops on
OZ starts the strip down
Starting on the rebuild
Fuse hoops done
All hoops on
Flat out with a few interesting pieces
13/11/10 09:02
Nice little step up this week for Skydive Lake Wanaka’s new Plane “Jafa”. Using our brandnew 200 AC/DC TIG welder, its awesome.
This is the start to what I anticipate as one of our best pieces. An airplane shaped light fitting. Exciting stuff. We will post more photos as we go.
Stage two complete for Alpine fencing. Installation of the role and non-role table and 4 meter lead in conveyer.

Candelabra with your loo?
26/10/10 22:29
How about a nice candelabra
with you nice new self composting toilet.


Beware the low flying baby
11/10/10 08:40
Things in the workshop this
week. Low flying baby and the prototype external tank
version of the self composting toilet. No log is any mach
for the Hipowarty.


The Machine is raging.
14/09/10 21:53
MAY E Machines square hole
cutting machine has been completed to its first stage.
There are a few small issues with it but all in all its a
master pice. Thanks to Alpine Fencing for the
opportunity.




Leaking keg
30/08/10 19:50
Ow no my keg is leaking. This is a leaking keg we made
for a TVC. need to work on the beer color though. Have
a look.
click me
click me
MAY E Machine Machine
29/08/10 17:58
This is the MAY E Machine
machine taking shape. It’s a machine that cuts square
holes on fence posts. Designed and built by MAY E Machine
for Alpine Fencing.


Stretch my trailer
06/08/10 19:50
Stretch my trailer, pimp my
ride, chop my shop. Yes MAY E Machine has chopped its
trailer to look more like a rail drag car than a handy
little slap on weekend trailer.


Stairway to the top
04/08/10 09:08
Skydive Lake Wanaka with the
help of MAY E Machine, have just installed a stairway to
take there customers to altitude replacing there Plain.


Bannister
07/07/10 08:09
This is a way out MAY E
Machine bannister taking shape. Steel frame with riveted
aluminium panels. Very cool.


Hooping mad
02/07/10 18:06
I’v heard of rabbit hooping
but get a load of this launching hoop we have just
finished for Wanaka Parasailing. I reckon if you stung
some bird netting in that hoop, you could get a few low
flying seagulls.


The Door
22/06/10 20:40
We have just finished and
installed the new door in our house. It works and looks
fantastic. The door is finished on the kitchen side with
aluminum and aircraft rivets. Then glued on the inside is
10mm of EVA foam, wool batts and black weed matting. Then
the lounge side is finished with sheets of perforated
steel and a steel frame to hold it all on, all finished
with a rust effect.




EWL
21/05/10 20:32
Another lineup of new Environmental
Wast self composting toilets hit MAY E Machine’s workshop
floor









